Supplier profile

Manufacturing depth you can inspect

MATCHO so is the seller of record, and we manufacture or directly control every line we list. Here is the plant footprint, the machinery behind the catalog and the standards an audit would look at.

Facility area
9,400 m²
Production lines
9
Quality staff
14
Audit standard
ISO 9001

Metal shop

Forging, CNC finishing and heat treatment for hand tools and hardware. Four production cells, two shifts, 60,000 finished units a month on stock patterns.

Ceramics

Jiggering and pressure casting with two kilns, glaze line and decal decoration. 80,000 pieces a month, with lead-free glaze tested per lot.

Textile unit

Circular knitting, cutting and sewing across three lines. 120,000 metres of knits and 25,000 finished apparel pieces a month at full capacity.

Private label

Separate finishing bay for buyers who need their own branding, labels and carton artwork. Runs from 500 units per style.

Factory standards

What an audit visit would see

Production and warehousing sit on one site, which is why a stock line can be packed and shipped within 48 hours of a cleared payment. Raw material, work-in-progress and finished goods are physically separated and labelled by batch.

Machine maintenance is logged weekly, calibration is recorded for measuring equipment, and every operator is trained on the reference sample for the line they run. Records are kept for two years and are available to buyers on request.

We hold ISO 9001 for quality management, and social compliance is audited annually by a third party against the standard our larger retail accounts require. Reports are shared under NDA.

Capacity

Stock, production runs and seasons

Roughly half of our output is held as stock lines — the catalog — and half is produced to order for buyers with their own specifications. The split protects both: stock buyers get immediate dispatch, and production buyers are not queued behind someone else's peak season.

Peak pressure runs from August to November. Production booked for that window is best confirmed by June; stock lines are unaffected but freight space tightens.

Request the factory pack